With a total investments of over 15 million euros, the new Terminal A was inaugurated in April 2008. It has a total of 6.200 sqm. divided in two main sections: check-in with 44+26 counters and luggage claiming area with 4 luggage conveyors. It has been designed under the last requirements concerning security, comfort, fast processing and achitectural image and fully complying with International Ship and Port Security Code (ISPS). The 2 mobile gangways specially designed for the new generation of ships and luggage conveyors, ensure passengers not to be mixed with trucks, forklifts and handling staff.
Terminal B is inaugurated in April 2005 with a total investment of over 10 million euros, was designed to operate home port calls of mega cruise ships up to 150.000 ton and 4.500 passengers. Terminal B has a total of 6.500 sqm. divided in two main areas: check-in area with 46+26 ounters and luggage claiming area with 4 luggage conveyors. It offers the last requirements concerning security, omfort, fast processing and architectural image, and it is equipped with 2 mobile gangways to avoid passengers crossing pier traffic.
Since 2010 the Terminal C has been improved with a new additional passenger embarkation system, comprising 2 mobile gangways, fix concourse and vertical communications building (escalators, lift and stairs). In 2015, a new concourse was erected connecting terminal C and B enabling to operate the Allure of The Seas during the entire season. A new gangway was also installed in order to be compatible with the new generation of ships.
The state-of-art World Trade Center is located at the Barcelona Wharf, with an international cruise terminal and a total of 260meters of berthing line and can receive up to two ships, the biggest one up to 255 meters long. The newly remodeled Terminal is conveniently located walking distance from the city centre.